308
submitted 9 months ago by L4s@lemmy.world to c/technology@lemmy.world

Microsoft Looking to Use Nuclear Reactors to Power Its Data Centers::undefined

you are viewing a single comment's thread
view the rest of the comments
[-] ninekeysdown@lemmy.world 43 points 9 months ago

That’s … actually pretty neat.

Makes a lot of sense given the amount of power needed to run a data centers like that. Definitely cleaner in the long run too.

They’ll still need backup power/generators but they’ll need a lot less of them and they’ll mostly be needed for the nuclear parts.

[-] tryptaminev@feddit.de 8 points 9 months ago

They could just run renewables since they already need batteries as you said.

Also i dont want incompetent people operating nuclear reactors. We saw what happened with that multiple times already and you still shouldnt eat boars in eastern Europe bc. auf radiation levels thanks to fucking Tschernobyl.

[-] LoreleiSankTheShip@lemmy.ml 7 points 9 months ago

You should research this a bit more because ironically more people get exposed to radiation in the coal industry than in nuclear, percentage wise. Also I live in Eastern Europe and all game is safe to eat.

[-] gnygnygny@lemm.ee 2 points 9 months ago

Nothing compare to the radiation levels in tchernobyl and under the 1,4 billions euros sarcophage.

[-] Earthwormjim91@lemmy.world 3 points 9 months ago

I take it you haven’t read the relatively new study that showed that the radiation in the animals in Eastern Europe is actually more from unregulated atomic bomb testing rather than Chernobyl.

[-] LifeInMultipleChoice@lemmy.world -1 points 9 months ago

There is another thread stating it is because training AI takes a lot of energy. Any reason to boost nuclear plants is good to me.

[-] Diplomjodler@feddit.de -4 points 9 months ago

The whole plan has only one minor flaw: It'll never work. Building a nuclear power plant never was, never is and never will be economical. The current boom in nuclear grandiose announcements is nothing but a smokescreen. The purpose is to delay the adoption of renewable energy with lofty promises that will never come to fruition. Then we'd be forced to keep using fossil fuels, which is the end goal.

[-] Earthwormjim91@lemmy.world 0 points 9 months ago

You comment has one minor flaw.

Small modular reactors are a thing now. NuScale has already had their VOYGR SMR plants approved for use in the US. Westinghouse has one that should be ready for sale in the next few years too.

Large nuclear plants aren’t economical for profit generation right now, but SMRs definitely have the ability to be economical for huge power users like Microsoft.

[-] Diplomjodler@feddit.de -1 points 9 months ago* (last edited 9 months ago)

The NRC approved the design, so now they can start building it. That is still a looong way off from having a working reactor. And all those companies are way behind their originally planned schedules. Which is my whole point. I'm not saying they might not get this stuff to work some day. I'm saying that it will take way too long to make any contribution to fighting climate change. We need to decarbonise now and and we have the technology to do it now.

[-] Earthwormjim91@lemmy.world 3 points 9 months ago

That’s got nothing to do with Microsoft though. Their reactor wouldn’t be used to power other people, only their own data centers.

They currently buy that from the grid, and they don’t really have any control over the source of that electricity generation. We should absolutely be pushing the power generators to go with renewables, but Microsoft isn’t a generator. They’re a customer like you or me.

They’re looking at moving to small reactors eventually because of the cost of buying from the grid, not for the environment.

[-] Diplomjodler@feddit.de -1 points 9 months ago

It would still be far cheaper to deploy the same kind of capacity in renewables. Whoever came up with this brilliant plan can't do basic math.

[-] Earthwormjim91@lemmy.world 2 points 9 months ago

Probably not because they would need to buy MUCH more land to do it.

SMRs are so much more compact per MW. The one from NuScale that is approved already can do 924MW in 0.05 square miles. To do the same capacity with wind would take 94 square miles and 17 square miles for solar.

Buying 17 square miles of land close enough to just one of their data centers would cost billions, on top of the cost of paying for the panels and installation.

The whole point of them looking at these at all is because they do not want to purchase from the grid.

this post was submitted on 01 Oct 2023
308 points (95.6% liked)

Technology

55643 readers
3516 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS