249
this post was submitted on 05 Nov 2024
249 points (99.2% liked)
Technology
60052 readers
2930 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
As LiPoly said, it doesn't really solve the problem. It's not useless, it does accomplish something, but not that. Locking dependencies isn't a security thing, it's a reproducible builds thing. You can accomplish that by just using a traditional static version of everything, but now you've got a maintenance headache as you're constantly needing to go in and update your dependency versions. You could instead use version ranging, but now you never actually know which version of a dependency any given build is going to end up using. Locking allows you to have the best of both worlds.
To understand how this works, lets take a look at a hypothetical. Lets say you have a code base, and a CICD setup. Additionally you're using a git-flow style release management where your release version is in master, your active development is in develop, and your feature work is done in feature branches. What you do is setup your version ranges to cover what the semantic versions of things say should be compatible (generally locked major version, and possibly locked minor depending on the library, but unlocked patch). In your CICD for CI builds of develop and feature branches you include a step that updates your lock file to the latest version of a library matching your version range. This insures that your develop and feature branches are always using the latest version of dependencies. For your master branch though, its CI job only builds, it never updates the lock file. This means when you merge a release to master your dependencies are effectively frozen. Every build from the master branch is guaranteed to use exactly the same versions of dependencies as when you merged it.